The Future of Wastewater Treatment Series: Washington, D.C.

This article is part of our feature on the future of wastewater in the U.S.’s fastest growing metro areas. We’re using the Transcend Design Generator to automatically build, expand, or upgrade regional wastewater treatment systems in each of these regions.

As we continue our series on automatically designing wastewater plants in rapidly growing US cities, we turn our attention to the nation’s capital, Washington, D.C., and its neighboring counties in Maryland and Virginia. Over the past decade, the District of Columbia and its surrounding areas have experienced significant population growth, with six counties listed in the TOP100 growing population by county from 2010 to 2020:

· #46 Loudoun County (Virginia): 107,119 population increase

· #50 Prince George’s County (Maryland): 99,182 population increase

· #58 Montgomery County (Maryland): 85,641 population increase

· #60 District of Columbia (DC): 84,867 population increase

· #72 Prince William County (Virginia): 76,569 population increase

· #100 Fairfax County (Virginia): 62,317 population increase

Note:

The fact that the Washington, D.C., metro area encompasses six counties involved in the TOP100 growing population list is indeed noteworthy, yet none of these counties rank near the top of the list. The highest-ranking county, Loudoun County, only reaches #46, which highlights the unique situation of the region, where population growth is distributed across multiple counties rather than being concentrated in a single county.

Determining the optimal wastewater infrastructure for the Washington, D.C., metropolitan area is particularly challenging due to the region’s unique geography, including rivers that separate various parts of the area, and the involvement of multiple states. Historically, cross-state collaboration in wastewater management projects has been difficult to achieve, adding another layer of complexity to the process of designing and implementing effective wastewater treatment solutions for the region.

Based on the resources we found on the corresponding counties, their current total wastewater treatment capacity is around 350 MGD. It is important to note that the majority of this capacity, 300 MGD, comes from a single wastewater treatment plant, Blue Plains. This further complicates the task of deciding how best to distribute the additional capacity needed across the various counties in the Washington, D.C., metropolitan area. 350 MGD is slightly more than what they currently need using the classic 70 gallons per person per day estimation. This means that a 35 MGD increase would be sufficient for all these counties; however, the real challenge lies in determining the most practical and effective way to implement this increase in capacity, given the unique geographic, political, and collaborative factors that influence the region’s wastewater infrastructure planning and development.

Given the successful collaboration demonstrated in the development and operation of the Blue Plains wastewater treatment plant, we propose constructing a new 35 MGD plant on the other side of the Potomac River to accommodate the growing needs of the Washington, D.C., metropolitan area. This new facility would employ Moving Bed Biofilm Reactor (MBBR) technology, which offers several advantages such as high treatment efficiency, a smaller footprint, and lower energy consumption compared to conventional systems. By building this new plant, the region will not only benefit from increased wastewater treatment capacity but also promote continued cooperation among the various counties involved in addressing the wastewater infrastructure demands of the area.

If you’d like to see the full design package for this treatment plant, send us a note at info@transcendinfra.com or contact us here and a member of our team will share it with you!

If you enjoyed this piece you may also want to read about the future of wastewater in Myrtle Beach.

Resources:

https://www.loudounwater.org/about/loudoun-water-facilities https://www.princegeorgescountymd.gov/463/Water-Sewer

Parkway Wastewater Treatment Facilities Prince George’s County, Md : Final Environmental Impact Statement

https://www.dcwater.com/blue-plains

Clients

Technology Providers & OEMs Technology Providers & OEMs

TDG rapidly generates accurate budgetary proposals to help suppliers bid more, win more, and sell more.

Asset Owners and Utilities Asset Owners and Utilities

TDG streamlines the capital planning and conceptual design processes to accelerate project timelines and deliver better outcomes.

EPCs, AECs, and Consultants EPCs, AECs, and Consultants

TDG enables engineering firms to deliver more value to their clients & increase competitiveness.

Individuals Individuals

TDG works for individual engineers who want to grow their business and reduce their non-billable time.

Academic Academic

Transcend supports students and professors around the world to incorporate TDG into their curriculum.

Resources

Articles Articles

Read posts written by Transcend team members sharing their points of view on the company mission, vision, and products.

Webinars Webinars

Register for our upcoming webinars or watch on-demand webinars like Transcend’s popular ‘How To’ Series.

Case studies Case studies

Understand how Transcend’s customers are utilizing TDG to bring more value to their customers and grow their businesses.

FAQ FAQ

View a list of the questions we are most frequently asked about our company and our software

Transcend tools Transcend tools

Access a number of tools Transcend has developed to help engineers and industry professionals take back their time.

Security Security

Learn more about Transcend’s security practices

Industries

Water and Wastewater Water and Wastewater

TDG creates unique, optimized designs of water & wastewater treatment facilities by automatically combining decisions and calculations from each engineering field.

Power Power

TDG creates unique, optimized designs of T&D assets by automatically combining decisions and calculations from each engineering discipline.

Solutions

WWTP Design WWTP Design

TDG generates optimized, unique designs for water and wastewater treatment facilities by automating decisions and calculations across engineering fields.

Substation Design Substation Design

TDG generates optimized, unique designs for T&D assets by automating decisions and calculations across engineering disciplines.

Utility Interconnection Hub Utility Interconnection Hub

For transmission providers and power utilities, simplify the interconnection process by integrating TDG into your website to ensure developers submit fully compliant collector substation designs from the start.

Transcend Proposal Generator Transcend Proposal Generator

Enables technology suppliers and OEMs to generate more proposals, faster, with more detail and less resources, so you can sell more of your technology and/or equipment

White Label Proposal Generator White Label Proposal Generator

Generate qualified leads, elevate your customer experience, and simplify your engineering and channel partner workflows in an intuitive, user-friendly interface integrated into your website.

PFAS Feasibility Study PFAS Feasibility Study

For drinking water utilities, automatically generate accurate CAPEX and OPEX estimates to calculate the cost of upgrading your facility to meet stringent PFAS regulations

Booster Station Design Booster Station Design

Automates and simplify the complex process of designing booster pumping stations

DC Battery Sizing DC Battery Sizing

Get precise battery sizing recommendations in minutes for renewable energy and other critical infrastructure projects