The global energy landscape is changing rapidly. As nations push towards decarbonization and electrification, renewable energy projects are sprouting up faster than ever before. On the demand side, we are seeing growth for the first time in decades with Data Centers and EV Charging continuing to roll out across the world.
Yet, a massive roadblock is threatening the progress—the interconnection queue backlog.
Utilities are under immense pressure to reduce interconnection backlogs while integrating more renewable energy sources into the grid. Traditional methods for reviewing and approving substation designs are slow, resource-intensive, and can lead to delays due to non-compliance with utility or industry standards. Join us as we take a look at:
Join us November 7, 2024 at 1pm EST
Transcend believes each team member brings a unique viewpoint on what we do and how we do it. Read about Transcend through the eyes of some of our team members by clicking the links below.
The engineering industry is facing a critical challenge as the demand for innovation, driven by rapid technological advancements, outpaces the…
Building Information Modeling (BIM) is transforming infrastructure design by providing an integrated, data-driven approach to managing projects throughout their entire…
Sustainability in infrastructure projects refers to designing, constructing, and operating civil structures in a manner that ensures they meet current…