US Midwest utility used TDG to tackle phosphorous limit impact on capital investment

To adapt to new phosphorous limits, a utility used TDG to prioritize upgrades at three wastewater plants, reducing the typical 6-month evaluation to just 1 month. This accelerated approach allowed the utility to evaluate multiple design alternatives and identify the most cost-effective, regulatory-compliant solutions.

Introduction

The Transcend Design Generator (TDG) offers solutions for asset owners and utilities in capital planning. It streamlines the creation of engineering documentation for infrastructure assets, enhancing control over the process and reducing total ownership costs.

Key features include assessing multiple design options for sustainability and resilience, automating design generation for existing and new assets, and optimizing project development costs.

Here, we introduce a specific use case for TDG for utilities looking to address more stringent regulations and prioritize the investments needed to meet them.

Situation

A utility faced the challenge of prioritizing investments across its three wastewater treatment plants due to limited budgets and a new regulatory requirement to achieve a lower phosphorous limit of 1 mg/l. Their plants required upgrades, and the utility used TDG to compare and prioritize these needs effectively.

Who

The people responsible for figuring out the solution were a:

Project Engineer (seconded from engineering firm): Seconded from the utility’s primary engineering partner, responsible for technical evaluations and design.

Head of Capital Planning: Oversees the strategic planning and allocation of capital investments.

Regulatory compliance Manager: Ensures adherence to environmental regulations and interfaces with regulatory agencies.

Task

The Project Engineer gathered initial needs for each plant (1 MGD, 4 MGD, and 10 MGD) from operations teams and internal documentation, including Facility Master Plans.

The Head of Capital Planning provided estimates for OPEX and CAPEX costs to compare alternatives.

The Regulatory Compliance Manager communicated with the state regulatory agency to understand the specifics of the new phosphorous limit, which will be implemented with the renewal of each plant’s NPDES permit in 2 years.

Action

The Project Engineer used TDG to generate conceptual designs for each facility to determine what changes will need to be made to each facility to meet the new phosphorous limit and necessary increases to plant capacity.

  • The engineer inputted parameters such as flow, influent characteristics, effluent parameters, and existing capacity into TDG.

  • The future increased flow was considered for the 1 and 4 MGD plants, which are nearing their 80% flow capacity limit.

  • The engineer generated 3-4 design alternatives for each plant, obtaining comprehensive civil, mechanical, and civil documents within 2 days, followed by a 2-week evaluation period.

Results

The adoption of TDG streamlined the alternatives evaluation process from the usual 6 months to just 1 month, allowing the Head of Capital Planning to include these projects in the upcoming capital improvement plan.

The Project Engineer presented these key findings from TDG to the Head of Capital Planning:

  • The 10 MGD plant could upgrade to Biological Phosphorous Removal (Bio-P) within its existing capacity to meet the requirement.

  • For the 4 MGD plant, Membrane Aerated Biofilm Reactor (MABR) technology was identified as a process intensification solution that wouldn’t require facility expansion.

  • The 1 MGD plant required construction of a new biological train and conversion to Bio-P to manage both higher flow and phosphorous limits.

  • Chemical phosphorous removal (ChemP) was deemed unfeasible due to high costs and supply chain volatility.

Going Forward

  • The utility is now incorporating these projects into their 2025-2030 Capital Improvement Plan, informed and expedited by the use of TDG’s generative design capabilities.

  • By accelerating the alternatives analysis process with TDG, the capital planning team now has additional time for thorough cost and supply chain analyses of the selected scenarios to reduce risk and optimize project outcomes.

Clients

Technology Providers & OEMs Technology Providers & OEMs

TDG rapidly generates accurate budgetary proposals to help suppliers bid more, win more, and sell more.

Asset Owners and Utilities Asset Owners and Utilities

TDG streamlines the capital planning and conceptual design processes to accelerate project timelines and deliver better outcomes.

EPCs, AECs, and Consultants EPCs, AECs, and Consultants

TDG enables engineering firms to deliver more value to their clients & increase competitiveness.

Individuals Individuals

TDG works for individual engineers who want to grow their business and reduce their non-billable time.

Academic Academic

Transcend supports students and professors around the world to incorporate TDG into their curriculum.

Resources

Articles Articles

Read posts written by Transcend team members sharing their points of view on the company mission, vision, and products.

Webinars Webinars

Watch on-demand webinars like Transcend’s popular ‘How To’ series.

Case studies Case studies

Understand how Transcend’s customers are utilizing TDG to bring more value to their customers and grow their businesses.

FAQ FAQ

View a list of the questions we are most frequently asked about our company and our software

Transcend tools Transcend tools

Access a number of tools Transcend has developed to help engineers and industry professionals take back their time.

Security Security

Learn more about Transcend’s security practices

Industries

Water and Wastewater Water and Wastewater

TDG creates unique, optimized designs of water & wastewater treatment facilities by automatically combining decisions and calculations from each engineering field.

Power Power

TDG creates unique, optimized designs of T&D assets by automatically combining decisions and calculations from each engineering discipline.