Resolving the Interconnection Queue Crisis

Ensuring Utilities Thrive as Centralized Power Providers Amidst New Regulatory Reforms

The interconnection queue backlog is intensifying, posing significant challenges to the renewable energy sector, utilities, and major power consumers. Download our whitepaper to learn how generative design empowers utilities to move forward with greater speed, efficiency, and impact.

Download Your Copy

Access at Scale

The world needs better infrastructure. We're here to help

Transcend’s mission is to transform the way asset owners, technology suppliers and engineering firms assess and design critical infrastructure.

Transcend Design Generator (TDG) is an intuitive, online generative design platform that enables capital planners, project developers, and engineering professionals to rapidly generate preliminary engineering designs for critical infrastructure, including the Water & Wastewater treatment and Power Sectors.

Book a Consultation

Transcend Design Generator (TDG) is used by the world’s leading asset owners, equipment suppliers, and engineering firms to streamline capital planning and budgeting processes.