Working with the Transcend Design Generator (TDG), Stanley Consultants was able to compress the timeframe to run three separate process calculations from 5 days to 1 day, thereby saving the client money and completing the project on time.
• The Pinewood Sanitary District (PSD) suffers from high volumes of Inflow and Infiltration (I&I) at their 1MGD wastewater resource recovery facility. Additionally, there were concerns about the performance of their Influent Screens and Aerobic Digester.
• The intermittent I&I issues caused periodic violations of the facilities existing NPDES Permit
• Working with the Transcend Design Generator (TDG), Stanley Consultants was able to automatically ascertain the appropriate sizing requirements for a new Flow Equalization Basin and an expansion to the existing Aerobic Digester.
• Additionally, Stanley Consultants was able to confirm that other treatment process units were adequately designed and sized.
• Using TDG compressed the timeframe to run three separate process calculations from 5 days to 1 day, thereby saving the client money and completing the project on time.
• The TDG outputs supported Stanley Consultants rigorous standards for high quality engineering documentation and yielded a branded and formatted professional design package.
Dave Prinzhorn, Sr. Engineer -Stanley Consultants
Please provide your information to download our detailed case study.
By submitting, I have read and agree with the provisions of the Privacy Policy and the terms and conditions of Terms of Service
People in Macedonia enjoy easy and fun gaming. Try Kazino Online MK. It’s safe, fast, and fair. Play on mobile or desktop anytime.