Working with the Transcend Design Generator (TDG), Stanley Consultants was able to compress the timeframe to run three separate process calculations from 5 days to 1 day, thereby saving the client money and completing the project on time.
• The Pinewood Sanitary District (PSD) suffers from high volumes of Inflow and Infiltration (I&I) at their 1MGD wastewater resource recovery facility. Additionally, there were concerns about the performance of their Influent Screens and Aerobic Digester.
• The intermittent I&I issues caused periodic violations of the facilities existing NPDES Permit
• Working with the Transcend Design Generator (TDG), Stanley Consultants was able to automatically ascertain the appropriate sizing requirements for a new Flow Equalization Basin and an expansion to the existing Aerobic Digester.
• Additionally, Stanley Consultants was able to confirm that other treatment process units were adequately designed and sized.
• Using TDG compressed the timeframe to run three separate process calculations from 5 days to 1 day, thereby saving the client money and completing the project on time.
• The TDG outputs supported Stanley Consultants rigorous standards for high quality engineering documentation and yielded a branded and formatted professional design package.
Dave Prinzhorn, Sr. Engineer -Stanley Consultants