Where Transcend Works
Every Region. One Platform.
Built for U.S. capital scrutiny and infrastructure complexity.
From IIJA-funded water treatment programs to PFAS treatment compliance and power utility interconnection, U.S. utilities and engineering consultants need early-stage computational design that holds up under regulatory and funding review. TDG embeds U.S. standards and delivers structured, engineering-grade design packages that strengthen business cases and align stakeholders before a single dollar is committed.
"The real value proposition for us has been the opportunity to compress time, be more efficient and optimize our resources."
— Chris Haney, President, STV Water
Active across: United States, Canada, Mexico, and more.
Designed for Brazil's 2033 sanitation ambitions and beyond.
Brazil’s largest utilities are racing to meet universal sanitation targets under the Legal Framework for Sanitation. Transcend supports this transformation with generative design software built to reduce OPEX and CAPEX at scale, turning site-specific inputs into complete wastewater treatment design packages in hours instead of weeks.
"The partnership with Transcend will also contribute to increased predictability and reduced risk in the allocation of our CAPEX. We are building an increasingly efficient Iguá, focused on execution and discipline."
— René Silva, CEO, Iguá Saneamento
Active across: Brazil, Colombia, Chile, Peru, Argentina, and more.
From AMP9 to the next wave of European infrastructure investment.
UK utilities are accelerating delivery under AMP8 while engineering standards across mainland Europe demand structured, auditable design workflows. Transcend brings augmented design engineering to water treatment, wastewater treatment, and power infrastructure across the region, supporting utilities and consultants who need outcome-based BIM and traceable design logic at every stage.
"We are looking around 23 week savings in optioneering."
— Robert Sutherland, Senior Project Manager, Scottish Water
Active across: United Kingdom, Netherlands, Germany, France, Spain, Italy, Portugal, Sweden, Norway, Denmark, Finland, Iceland, Faroe Islands, Switzerland, Belgium, Ireland, Saudi Arabia, UAE, Qatar, Oman, Israel, Egypt, South Africa, Nigeria, Kenya, Tanzania, and more.
Proven at scale across Asia Pacific's most complex infrastructure projects.
From multilateral development finance programs to national water and power infrastructure investment, Transcend has delivered generative engineering software in some of the region’s most demanding environments. As Asia Pacific accelerates critical infrastructure investment, TDG provides the computational design speed, structure, and auditability these projects require.
- Momoko Nitta, Senior Urban Development Specialist at Asian Development Bank
Featured project: Asian Development Bank — Rayerbazar WWTP, Bangladesh
Active across: Australia, New Zealand, India, China, Japan, South Korea, Philippines, Indonesia, Malaysia, Singapore, Bangladesh, Vietnam, Thailand, and more.
What does a generative design output actually look like?
TDG doesn’t produce templates or slide decks. Every output is a structured, engineering-grade design package generated from real project inputs – covering process design basis, unit sizing, CAPEX and OPEX, and mass balance.
We’re publishing a series of sample packages by region, so you can see exactly what generative design software produces for infrastructure in your market. Explore available examples below.
Netherlands
A complete preliminary design for a 200,000 m³/d water resource recovery facility in the Netherlands. Includes activated sludge process design, full unit sizing, CAPEX/OPEX inputs, and mass balance table — generated by TDG in hours.
Sample Concepts Coming Soon:
Australia · New Zealand · Spain · Portugal · Italy · Denmark · Sweden · Norway · Finland · Iceland · Faroe Islands
What you design first determines everything else
Misalignment, delays, and rework start upstream. Transcend alleviates these issues by generating traceable design data aligned with stakeholder expectations – ready to move your project forward.
We’re working with teams across the infrastructure ecosystem to make early-stage planning faster, clearer, and more collaborative.





















