Utility Hub
Power Utility Interconnection Solution: Accelerate Approvals with Automated Substation Designs
Utilities are under immense pressure to reduce interconnection backlogs while integrating more renewable energy sources into the grid. Traditional methods for reviewing and approving substation designs are slow, resource-intensive, and can lead to delays due to non-compliance with utility or industry standards.

Simplify the Interconnection Process
The Transcend Utility Interconnection Hub simplifies the interconnection process by providing an automated platform that ensures developers submit fully compliant collector substation designs from the start. This helps utilities reduce the time and resources required for design iterations and speeds up approvals.
Automate substation design submissions to ensure compliance with utility-specific standards (FERC, state regulations)
Ease the interconnection backlog by minimizing design review cycles and bottlenecks for both DG and utility-scale projects
Automate technical reviews and engineering studies
Gain full visibility into all design submissions for better project management and planning
Improve collaboration with developers through a user-friendly platform that enhances submission quality
Integrate with existing utility systems (GIS, CIS, etc) to ensure data consistency