Software for infrastructure
User-defined pump placement and pressure specs
This lays the groundwork for future hydraulic analysis, while delivering real, immediate value today.
Because the site isn’t always flat
fMany wastewater projects involve terrain challenges or legacy infrastructure that can’t be ignored. Until now, early-stage designs often assumed flat sites and gravity flow—leading to unrealistic energy modeling, rework, and slowdowns.
This feature empowers engineers to account for topography, civil constraints, and operational realities from the start.
Engineering Consultants
- Account for unknowns in the earliest phases of design
- Generate detailed, editable outputs
- Support faster permitting and reviews
Capital Planners & Utilities
- Better energy forecasts
- Transparent equipment decisions
- Fewer surprises during construction
Supporting phased upgrades and terrain-sensitive designs
Depending on the site, many water and wastewater projects face steep terrain, buried infrastructure, and constrained urban footprints. Planning around these realities—especially in retrofit and brownfield contexts—requires more than flat-site assumptions.
TDG’s Lift Station functionality allows utilities and consultants to:
By capturing hydraulic complexity up front, design teams can reduce rework, accelerate alignment with regulatory and funding partners, and deliver more credible proposals in a shifting infrastructure landscape.
Designed for complexity. Built for speed.
This new module helps eliminate a key barrier to realistic, accurate wastewater asset design. By putting pumping decisions in your hands—while TDG handles the documentation—you accelerate delivery and reduce costly late-stage changes.